Repair Work On The 2nd Observation Platform And Forest Enclosures
Work on the 2nd Observation Platform and Forest enclosures (Pen A, B, C and K) were undertaken on 13th August 2018 to repair the severe damage from fallen trees due to wind and rain storms. Damaged trees avoid any potential accidents in future, and forest enclosure fences were repaired that. The design of 2nd Observation Platform was revamped to accommodate more visitors and repair works were completed on 16th November 2018 before reopening to the public on 17th November 2018.








